Power Factor: Why Heaters Are Almost Perfect

If your factory gets a power factor (PF) penalty on the electric bill, it is not the heaters. Heaters are resistive loads and run at PF = 1.0, the best possible.

What is power factor

Real power (kW) does the work. Apparent power (kVA) is what the grid supplies. Power factor = kW / kVA. Resistive loads (heaters, lights, toasters) have PF = 1.0. Motors, welders, LED power supplies pull PF down to 0.7 or 0.8.

Why the power company cares

At PF 0.8, a 100 kW load draws 125 kVA. The cables and transformers run hotter for the same real work. The power company charges you for kVA. Low PF = higher bill.

How to fix it

A customer with 200 kW of duct heaters had a PF penalty. We checked - the heaters were 1.0 PF. The penalty came from 80 kW of compressors and chillers. They installed a 150 kVAR capacitor bank. Penalty gone.

Need heater circuits for your plant?

Our heaters are pure resistive, PF 1.0. We can build them into your panel.

Send Your Specs